Betreibt ein flexibles Rabattsystem! Tel +371 67705704
1| 2| 3| 4| 5

Polycarbonate installation and maintenanse

Installation guidelines

  • Note the thermal expansion of sheets when fixint it to sub-construction (~3 mm for every 1 m of length)
  • Wall direction should match slope and should be vertical
  • Bending direction should be in transverse section of walls
  • Wash sheets with water and soft rag
  • Do not clean with abrasives or sharp tools, as far as solvents of acids
  • Close open walls with sealing and anti-dust tapes. U-profiles also should be used.
  • To fix sheet to your construction, drill holes larger than screw diameter to provide thermal expansion. Screws should have a rubber band to protect cameras from moisture.
  • Do mot place screws closer than 40mm to sheet edges.

Installation guidelines

Distance between rafters, m4 mm6mm8mm10mm16mm
0,5030
801401800400
0,6060
100
120350
0,70– 6080200
0,90– – 60100
1,00– – – 60

Multiwall Polycarbonate Properties

 

Thickness
mm

CellsU-value W/m2KLight transmission %
clear/bronze
Aclustical isolation dBMin bending
radius m
413,982 / –180,60
613,684 / 60180,90
813,281 / 65181,20
1012,884 / 44201,50
1622,373 / 25222,40
25S21,557 / 15225,30
1| 2| 3| 4| 5
Datennutzungs | Kontakt
1995 – 2025 © Kviller SIA
Um unsere Webseite für Sie optimal zu gestalten und fortlaufend verbessern zu können, verwenden wir Cookies. Durch die weitere Nutzung der Webseite stimmen Sie der Verwendung von Cookies zu.
OK